Testing & Validation Module Guide
Follow Test Tessa as two dry-room passes do not replace a failed damp-pump-room condition.

The sensor works in two dry rooms.

The same sensor fails in the damp pump room.

Set the build, sites, time window, and stop rule first.

The result covers only the tested build, sites, and time.
Start With the Module
Prove an IoT build works before the field does it for you: test methods, environmental and HIL testing, field diagnostics, and the evidence records that make a release defensible.
This guide maps the current learning path for Testing & Validation. The module contains 21 chapters, linked below in the order learners can study them.
Chapters by Part
Test Methods
Simulation & Emulation
Field Testing
Security & Traffic Testing
CI/CD & Deployment
Case Studies
Choose a Starting Point
If this subject is new, follow the parts and chapters in the order shown above. If you already have a specific design or troubleshooting question, use the relevant part heading and open the direct chapter link whose title matches that question.
Use the sidebar and site search for supporting material; use this chapter map as your main route through the module.
How to Use This Material
- Start with the first chapter in the relevant part when the topic is unfamiliar.
- Use direct chapter links for study plans, lab preparation, and review evidence.
