← Back to the chapter · Next detail →
Technical detail · Industrial and Wearable Kits
Electrical and mechanical trial boundaries
- Electrical boundary: separate logic ground, field wiring, surge protection, fuses, TVS placement, opto-isolation, 4-20 mA loops, 0-10 V inputs, RS-485 termination, and CAN termination from the convenient dev-board wiring.
- Mechanical boundary: check gasket pressure, IP-rated enclosure assumptions, antenna keep-out, cable glands, strain relief, clip retention, textile routing, cleaning method, and repeated donning or removal.
- Operational boundary: verify provisioning, replacement, calibration, firmware update, rollback, local logs, support diagnostics, privacy notice, retention policy, and data deletion before a field trial.
- Integration boundary: test the exact message and state contract between body node, phone or hub, site gateway, dashboard, and supervisor workflow instead of relying on two separate demos.
The kit has done its job when it exposes which industrial, wearable, data, and service checks must repeat in the next product form.
Under the hood, industrial evidence depends on protection and diagnostics as much as sensing. A prototype that ignores TVS diodes, fusing, reverse-polarity protection, opto-isolation, terminal labeling, cable glands, watchdog behavior, and local status codes can pass a lab script and still be impossible to maintain. Wearable evidence has its own hidden limits: accelerometer axes rotate with the body, optical sensors need stable contact and light control, ECG electrodes need skin preparation and safe front-end design, and small batteries change behavior with charge age and temperature.