From millijoules to service days

The local path costs 180 mW×5.0 s=900180\ \mathrm{mW}\times5.0\ \mathrm{s}=900 mJ, while the Wi-Fi path costs 261 mJ. A 150 mAh, 3.7 V cell with 2% monthly self-discharge and 15% reserve supplies about 1.66×1061.66\times10^6 mJ. At 1,440 events per day, those ledgers yield 1.28 local days or 4.43 offloaded days.