You now know:

  • The sample 100-motor case uses 8 historical failures, 12 hours per failure, $5,000 per downtime hour, 85% prediction, and a 4.6-month payback after annual operating cost.
  • The separate chemical-plant example pays back in about 9 months after subtracting $50,000/year operating cost from prevented-failure savings.
  • Phase 1 should select 10-20 high-criticality assets, prove at least one previously undetected issue, and expand only after technician-confirmed alert quality.