Planning Cost Comparison

Planning Cost Comparison

animation
iiot
maintenance
Try Change Maintenance Strategy: and Downtime Cost ($/hour): to compare annual costs. Then press Calculate maintenance costs.
Observe After pressing Calculate maintenance costs, watch total annual cost and annual downtime cost as Downtime Cost ($/hour): changes.
Explain Describe how Total Facility Horsepower: changes annual maintenance cost after you press Calculate maintenance costs.

Technical boundaries. The model uses fixed strategy costs per HP and downtime factors. Downtime assumes 8 failures per year and 12 hours per failure.

Planning Cost Comparison

Strategy Example Cost Pattern Budget Pattern Unplanned Downtime Pattern
Reactive Highest emergency repair exposure Large unplanned share Highest
Preventive Scheduled replacement and inspection cost Larger planned share Lower, but parts may be changed early
Predictive Sensor, analytics, and review workflow cost Planned around condition evidence Lower when alerts are trusted and actionable

Use the calculator above as an editable scenario model. For example, a plant might compare an assumed current maintenance factor with an assumed condition-based maintenance factor for a group of motors:

Current-state annual maintenance factor: Cost=5,000 HP×$12.50/HP=$62,500/year\text{Cost} = 5{,}000 \text{ HP} \times \$12.50/\text{HP} = \$62{,}500/\text{year}

Condition-based annual maintenance factor: Cost=5,000 HP×$4/HP=$20,000/year\text{Cost} = 5{,}000 \text{ HP} \times \$4/\text{HP} = \$20{,}000/\text{year}

Example maintenance-cost difference: $62,500 - $20,000 = $42,500

If the predictive maintenance system (sensors, installation, software, and integration) costs $180,000 upfront with 36,000annualoperatingcosts,thisnarrowmaintenance−costmodelproduces:36,000 annual operating costs, this narrow maintenance-cost model produces:Net Savings=$42,500−$36,000=$6,500/year\text{Net Savings} = \$42{,}500 - \$36{,}000 = \$6{,}500/\text{year}$

The narrow maintenance-cost payback would be: Payback=$180,000$6,500≈27.7 years\text{Payback} = \frac{\$180{,}000}{\$6{,}500} \approx 27.7 \text{ years}

This does not prove the project is justified. It shows why the business case must include the local downtime rate, fault probability, spare-part lead time, false-positive cost, and whether the alert actually arrives early enough for planned work.

Back to the chapter