← Back to the chapter · Previous detail

Technical detail · Network Design: Topology Tradeoffs

Test lighting recovery after a relay loses power

Use the RFC 6550 link in Mesh to identify what RPL can repair. The specification describes local repair mechanisms. Measure lighting recovery in the pilot against the facilities deadline. Recovery depends on the deployed routes and settings.

In this teaching trial, facilities requires the target lamp to respond correctly to a fresh command within 0.2 seconds, with useful service restored within 5 seconds of cutting power to the named relay L2-R1. Keep the background traffic and the command rate fixed. First verify commands work with the relay powered. At 0 seconds cut its power on the isolated pilot segment. Send a fresh, numbered command every second. For each probe, request a change from the lamp’s observed state. Log the command ID and send time, whether the lamp reached the requested state within the allowed time, and the time of the first useful response. Use the observed lamp state to score a command.

For example, probes sent at 1 and 2 seconds miss. The 3-second probe changes the lamp to the requested state at 3.2 seconds, and subsequent probes stay on time. This run passes the 5-second recovery deadline. If service returns in a single sustained transition and the misses are due to the outage, the onset of on-time service for new commands is between the 2- and 3-second probe sends. The probe spacing gives a 1-second bracket, and the first observed useful response was at 3.2 seconds. A flapping path or unrelated packet loss weakens that bracket. If no working alternate route exists and no probe succeeds within the deadline, record a fail, retain the misses, and check the local fallback and manual override before revising the topology.

← Back to the chapter · Previous detail