Checkpoint: Timing Ladder

Knowledge check · self-test
Checkpoint: Timing Ladder
You now know: Begin with level 0 field devices can operate below 1 ms, while Level 1 control commonly sits in the 1-10 ms range. Next consider level 2 supervision moves at 100 ms-1s, Level 3 operations moves in seconds to minutes, and Level 4 enterprise work moves in hours-days. Then test a single machine event can create a local trip, SCADA alarm, historian sample, MES quality hold, and ERP cost update without giving each record the same deadline.
You now know: Begin with level 0 field devices can operate below 1 ms, while Level 1 control commonly sits in the 1-10 ms range. Next consider level 2 supervision moves at 100 ms-1s, Level 3 operations moves in seconds to minutes, and Level 4 enterprise work moves in hours-days. Then test a single machine event can create a local trip, SCADA alarm, historian sample, MES quality hold, and ERP cost update without giving each record the same deadline.
Back to Real-Time ISA-95: Timing Foundations: Read the Timing Ladder