Soil Sensor Model and Bench Charge

Soil Sensor Model and Bench Charge

Try Press Step to compare the highlighted radio peaks and see which trace stays at its peak longer.

Compare charge across a complete reporting period

Charge validation

Follow the saved model estimate, the prototype trace, and the evidence used to revise the model.

Saved tool run

  • Reporting interval · 15 minutes / 900 s
  • Active · 8 mA for 2.0 s
  • Transmit · 42 mA for 0.8 s
  • Sleep · 0.012 mA for 897.2 s
  • Saved tool estimate · 1.608 mAh/day from the rounded 0.067 mA average
  • Output range · Unspecified in the chapter
  • Assumptions · One active and one transmit interval per period, with the remaining time spent in sleep

Bench view · Illustrative trace

Schematic current versus time · Short events expanded.

Measure from the start of a report to the start of the next report.

Save the model inputs and assumptions so you can reproduce the prediction.

Observe The bench plateau stretches farther than the model plateau at the same height, and the next frame shades both traces from one report start to the next, a 900 s span.
Explain Charge over 900 s depends on how long current flows at each level, so equal radio peaks alone cannot establish equal charge per report.

Technical boundaries. The current traces are schematic, with short events stretched for visibility. The saved model assumes one active interval and one transmission per report, with sleep filling the rest. The prototype figure is back-calculated from a rounded daily value, and validation still requires the actual trace and an acceptance criterion.

Back to the chapter