Meter Outage Backfill Evidence

Meter Outage Backfill Evidence

Try Press Step to see where the first scheduled reading goes when the hourly reporting path becomes unavailable.

Match the records across the outage

◆ Hourly outage test

Meter

Running cumulative register Scheduled observation

Local buffer

Ready to retain records

Collection/backend

Earlier reading already accepted

    Scheduled observation

    The hourly test follows cumulative readings with a meter identity, unit, and observation time.

    Observe The short-buffer ledger highlights O5 as missing a matching record, while the complete fixture later shows separate Collection receipt and Acceptance columns for all 12 slots.
    Explain The 12 expected records count the outage-start observation and stop before restoration. The replay calls backfill complete once each meter identity and original observation time match both a receipt and an acceptance record.

    Technical boundaries. The hourly fixture uses symbolic register values and observation tags. The short-buffer branch discloses one missing match and leaves the other slots unspecified. Rollover needs a separate test, and the actual heartbeat and missed-report thresholds depend on deployment settings.

    Back to the chapter