Review multi-admin regression

Review multi-admin regression

Try Select Step to see where the second administrator puts the same lock in a separate fabric.

Review multi-admin regression

Matter testing
  1. First controller
  2. Lock

First fabric

  • Controller commissions the lock
  • Fabric = shared trust group

First-controller results

  • First commissioning: Pass
  • Attestation (device identity check): Pass
  • Basic commands: Pass

First controller

The first controller sets up the lock, verifies its identity, and runs basic commands successfully.

Observe Frame 3 keeps the first controller's passing results visible and adds Access lost under Observed. The next frame adds Hold under Release readiness.
Explain Release readiness remains on hold in frame 6 because post-reboot session and access-control recovery was inconsistent and the planned retest results are still pending.

Technical boundaries. The failed record leaves the affected fabric unidentified and the split between secure-session recovery and authorization unresolved. The follow-up record contains a retest plan with results pending. An official determination belongs to the authorized certification process.