When to Roll Back the G2 Move
When to Roll Back the G2 Move
Follow the routes from move to retest
Change controlG2 routes
Old-position baseline · 20 reachable
18 direct2 via a relay
Candidate position · Convergence in progress
Candidate observation · 19 reachable of 20
14 direct5 via a relay
Latency or retry counts
- Baseline value
- Unreported
- Candidate value
- Compare after convergence
- Unreported
Candidate: Hold · G2 restored to the old position
Retest pending
Expected inventory · 20 sensors
S19
Reachable
Check after convergence
No path · shelf unmonitored at the candidate position
Verify route and identity at the old position
Rollback triggers
S19 remains absent · observed
or
A relay exceeds its limit · status unreported
Collect and compare with baseline
- Routes
- All 20 identities and their credentials
- Alerts
- Stored data
Close only when checks agree with baseline.
After closure, check that normal alerting resumes for all 20 sensors.
Capture the old-position baseline
Baseline at the old G2 position. All 20 sensors are reachable. There are 18 direct routes and 2 routes via a relay.
Technical boundaries. This walkthrough compares the old G2 position with one candidate. Latency and retry counts are unreported for both, and the relay-limit trigger has unreported status. After restoration, the replay lists the baseline checks to repeat and makes closure conditional on agreement.