Local and Remote Control Loop Deadline Simulator

Local and Remote Control Loop Deadline Simulator

Try Add remote delay and link loss to the 5 ms loop.
Observe Compare how many commands meet the loop deadline on the local and remote paths.
Explain Explain why time-critical control stays local while the dashboard path carries evidence only.
Technical boundaries. Expected-value model with a fixed delay: it has no jitter, queueing or retransmission, although the chapter says remote delay is uncertain. The 5 ms PLC loop comes from the chapter; the remote delay, link loss and command count are hypothetical. Not a control-system validation.

Times are in milliseconds. Command counts are expected values (loss percentage times commands sent), not outcomes observed for individual commands, so they can be fractional (one command at 50% loss gives 0.5 lost and 0.5 arriving). The chapter gives only a 5 ms PLC loop: it does not give a separate measured local execution time or deadline, so Chapter case sets both to 5 ms. The delay, loss and command count are hypothetical; Chapter case sets delay and loss to zero.

Back to the chapter