Hardware Selection Optimizer
Hardware Selection Optimizer
Choose Optimal IoT Hardware
IoT Hardware Selection Advisor
Choose a realistic device scenario, adjust the hardware constraints, and compare MCU recommendations with rationale, radar comparison, and a bill of materials.
Try
Set Power Source to Battery, Environment to Outdoor, Processing Power to Low, and Target Hardware Budget to $15.
Observe
After Check Requirements, candidates above $15 or without the Required Connectivity are excluded before radar preferences can improve their rank.
Explain
A $15 ceiling and required radio are hard filters; remaining boards score relative compute, power, environment, interface, and cost fit.
Legend. Each coloured shape is a hardware candidate; farther from the centre indicates stronger fit for the labelled requirement.
Technical boundaries. The selector ranks a finite teaching catalogue with fixed capability scores. It does not benchmark firmware, verify electrical compatibility, model peripherals and enclosure thermals, price current supply, assess lifecycle availability, or replace prototype testing.
Goal
Balance MCU performance, power draw, radios, environment, and cost.
Try
Compare Battery Sensor Node with LoRa Field Sensor, then tighten the budget.
Watch
Use the top-pick reason, constraint table, and BOM total to see the compromise.
Reflect
Which constraint would force a board redesign or an external module?
Guided Investigation
- Start with Battery Sensor Node and note why Wi-Fi plus BLE favors a general-purpose SoC.
- Switch to LoRa Field Sensor and watch power draw, environment, and radio range reshape the ranking.
- Use Industrial Gateway to see why connectivity can matter more than low component cost.
Scenario Focus
Battery Sensor Node needs Wi-Fi setup, BLE commissioning, and enough battery life for periodic sensing.
Requirements
$15
Workload Snapshot
Budget
--
Radios
--
Risk
--
Radar Comparison
Top Recommendations
Why the Top Choice Fits
Adjust requirements to see the recommendation rationale.
Constraint Check
| Question | Current Signal | Why It Matters |
|---|
Bill of Materials for Top Pick
| Component | Part | Qty | Unit Cost | Subtotal |
|---|---|---|---|---|
| Total | -- | |||
The BOM updates when a new top pick is selected.