viewof defbEcoNodes = Inputs.range([2, 100], {value: 24, step: 1, label: "Battery sensor stations"})
viewof defbEcoGateways = Inputs.range([1, 6], {value: 2, step: 1, label: "LoRa gateways"})
viewof defbEcoNodeCost = Inputs.range([20, 400], {value: 95, step: 5, label: "Node hardware and enclosure cost"})
viewof defbEcoGatewayCost = Inputs.range([200, 3000], {value: 850, step: 50, label: "Gateway, backhaul, and enclosure cost"})
viewof defbEcoDailyEnergy = Inputs.range([0.5, 100], {value: 8, step: 0.5, label: "Measured node energy (mWh/day)"})
viewof defbEcoBattery = Inputs.range([1, 100], {value: 18, step: 1, label: "Usable battery energy (Wh)"})
viewof defbEcoYears = Inputs.range([1, 10], {value: 5, step: 1, label: "Planning horizon (years)"})
viewof defbEcoVisits = Inputs.range([0, 12], {value: 2, step: 1, label: "Scheduled site visits per year"})
viewof defbEcoVisitCost = Inputs.range([50, 1500], {value: 350, step: 25, label: "Cost per cluster visit"})
viewof defbEcoSecurityInitial = Inputs.range([0, 10000], {value: 1800, step: 100, label: "Initial identity, hardening, and review budget"})
viewof defbEcoSecurityAnnual = Inputs.range([0, 5000], {value: 600, step: 100, label: "Annual key, patch, and audit budget"})Bounded Scenario: Remote LoRa Station Cluster
Bounded Scenario: Remote LoRa Station Cluster
animation
energy-power
operation-costs
lora
Try Change Measured node energy (mWh/day), then press Calculate.
Observe Press Calculate and watch Ideal battery interval before derating and Total planning cost.
Explain Describe how measured node energy changes replacement batteries when you press Calculate.
Technical boundaries. Every number is a replaceable planning assumption, and the battery interval is ideal before derating. Add installation, permits, data service, spares, tax, and decommissioning when they apply.
Bounded Scenario: Remote LoRa Station Cluster
The existing vineyard case already teaches that sensing can create operational value. Repeating its water-saving story would add little. This scenario asks a different question: what does a small remote monitoring cluster cost to keep powered, reachable, and trustworthy for its full service life? It treats every number as a replaceable planning assumption and keeps security operations visible instead of hiding them inside “gateway cost.”
The security budget must buy concrete work: unique device and gateway identities, protected key storage, authenticated updates, disabled unused services and ports, least-privilege backhaul, credential rotation, log retention, vulnerability response, and a recovery test. The power budget must come from measured normal, retry, join, fault, and cold-temperature traces. The cost decision is acceptable only if it records who owns each recurring action and what happens when a station is unreachable, a battery misses its service interval, or a gateway credential is suspected compromised.