DTN Network Operations Checkpoints

Knowledge check · self-test
DTN Network Operations Checkpoints
Check store-carry-forward fit: distinguish a current route from a future contact.
Check store-carry-forward fit: distinguish a current route from a future contact.
::: {.callout-tip}
##
Checkpoint: Store-Carry-Forward Fit {.depth-l0}
You now know:
- DSDV, DSR, and ZRP assume connected paths; they fail when partitions cannot exchange route messages.
- DTN preserves the bundle locally, carries it on a mobile node, and forwards it during a later contact.
- The correct fit is a delay-tolerant mission: wildlife tracking, vehicular networks, rural IoT, disaster recovery, or space networks.
:::
Checkpoint: Store-Carry-Forward Fit {.depth-l0}
You now know:
- DSDV, DSR, and ZRP assume connected paths; they fail when partitions cannot exchange route messages.
- DTN preserves the bundle locally, carries it on a mobile node, and forwards it during a later contact.
- The correct fit is a delay-tolerant mission: wildlife tracking, vehicular networks, rural IoT, disaster recovery, or space networks.
:::::: {.callout-tip}
##
Checkpoint: Contact and Buffer Budget {.depth-l0}
You now know:
- The elephant example generates 2,112 bytes/day with headers and needs about 173 KiB after five relay copies.
- A 45 second contact at 250 kbps can move 1,406,250 bytes, so contact capacity is not the bottleneck in this scenario.
- L=6 source spray-and-wait leaves six holders, including the source, after five relay transfers.
- Under the stated independent-contact assumptions, the simplified spray-plus-wait phase means sum to about 17.97 hours; this is not measured field performance.
:::
Checkpoint: Contact and Buffer Budget {.depth-l0}
You now know:
- The elephant example generates 2,112 bytes/day with headers and needs about 173 KiB after five relay copies.
- A 45 second contact at 250 kbps can move 1,406,250 bytes, so contact capacity is not the bottleneck in this scenario.
- L=6 source spray-and-wait leaves six holders, including the source, after five relay transfers.
- Under the stated independent-contact assumptions, the simplified spray-plus-wait phase means sum to about 17.97 hours; this is not measured field performance.
:::Back to Delay-Tolerant Networks: Disconnected Operations: Back to DTN Network Operations