Skip to content

Checkpoint: Change and Accumulation

Knowledge check · self-test

Checkpoint: Change and Accumulation

You now know: - A derivative describes a rate of change, such as temperature in degrees C/second, charge flow in Amperes, or velocity in m/s. - An integral adds small pieces into a total, such as power over time, bits per second over time, or current over time. - The energy-budget example combines 50 mW for 10 ms with 0.01 mW for 990 ms to get about 0.51 mJ per cycle.

Back to the chapter →

You now know: - A derivative describes a rate of change, such as temperature in degrees C/second, charge flow in Amperes, or velocity in m/s. - An integral adds small pieces into a total, such as power over time, bits per second over time, or current over time. - The energy-budget example combines 50 mW for 10 ms with 0.01 mW for 990 ms to get about 0.51 mJ per cycle.

Back to IoT Mathematics: Calculus, Exponents, and Logs: Measure Change and Accumulation