Skip to content

Timing promises and technology placement

Knowledge check · self-test

Timing promises and technology placement

You now know: Begin with hard real-time means a missed deadline is a failure, which is why safety systems and coordinated motion need bounded worst-case execution time. Next consider soft real-time fits HMI updates, data logging, trend analysis, and operator notifications where delay degrades usefulness. Then test best-effort paths belong to historical analysis, business reporting, email notifications, and other work where completeness matters more than millisecond delivery. You now know: Begin with level 0-1 control can need EtherCAT or PROFINET IRT below 100μs, while Level 1-2 traffic can often use PROFINET or EtherNet/IP in the 1-10 ms range. Next consider oPC-UA fits the Level 2-3 boundary because MES and historian consumers need semantic context, not drive-cycle ownership. Then test rEST APIs and MQTT belong at Level 3-4 integration when the path is planning, analytics, or dashboards rather than machine control.

Back to the chapter →

You now know: Begin with hard real-time means a missed deadline is a failure, which is why safety systems and coordinated motion need bounded worst-case execution time. Next consider soft real-time fits HMI updates, data logging, trend analysis, and operator notifications where delay degrades usefulness. Then test best-effort paths belong to historical analysis, business reporting, email notifications, and other work where completeness matters more than millisecond delivery. You now know: Begin with level 0-1 control can need EtherCAT or PROFINET IRT below 100μs, while Level 1-2 traffic can often use PROFINET or EtherNet/IP in the 1-10 ms range. Next consider oPC-UA fits the Level 2-3 boundary because MES and historian consumers need semantic context, not drive-cycle ownership. Then test rEST APIs and MQTT belong at Level 3-4 integration when the path is planning, analytics, or dashboards rather than machine control.

Back to Real-Time ISA-95: Determinism and Technology Mapping: Map Technologies to Their Duties