TPL5110 Wake, Verified Commit and Power Cutoff

TPL5110 Wake, Verified Commit and Power Cutoff

Try Press Step once to watch DRV, the timer output, go low and switch power on for the cold boot.

TPL5110 Wake, Verified Commit and Power Cutoff

Step-through

Trace a normal TPL5110 wake through cold boot, verified commit and power removal, then distinguish the timer’s forced-off boundary from an earlier application safety deadline.

With the load disconnected, account for the timer, switch leakage and any intentionally retained domain.

Always-powered domain Battery TPL5110 timer DRV MOSFET Switched domain MCU Sensors Radio Open · off DONE to timer Signals · schematic time → DRV Load rail DONE High Off Unavailable
Observe On the normal trace, DONE rises before the load rail falls. On the hung trace, DONE stays low until power is removed, with forced-off marked about 50 ms before the next wake.
Explain The firmware holds DONE low until the required work can survive power loss and the outputs are safe. The TPL5110 cuts power on the rising edge. With no edge, repeating timer mode reaches forced-off.

Technical boundaries. The signal lanes use schematic time. The forced-off example assumes repeating timer mode with a missing DONE edge. The earlier safety deadline belongs to the application, and the actual safe response requires separate design and verification.

Back to the chapter