Signed Link Budget and Fade Margin
Signed Link Budget and Fade Margin
Trace the received power as added path loss changes.
Link budgetPower ledger
Compare absolute received power with the receiver thresholds.
Receiver scale
- S_rx
- Specified sensitivity for this receiver mode and performance criterion (dBm)
- M
- Required positive fade reserve (dB)
Set the receiver thresholds
Compare with the specified sensitivity for this receiver mode and performance criterion. Adding fade margin gives the design target.
Power ledger
- P_tx Transmit power dBm
- + G_tx Transmit antenna gain dBi
- + G_rx Receive antenna gain dBi
Receiver scale
- S_rx
- Specified sensitivity for this receiver mode and performance criterion (dBm)
- M
- Required positive fade reserve (dB)
Add the transmit power and antenna gains
Start with transmit power and add the transmit and receive antenna gains in the intended directions.
Power ledger
- P_tx Transmit power dBm
- + G_tx Transmit antenna gain dBi
- + G_rx Receive antenna gain dBi
- − L_path Path loss dB
- − L_cable Cable loss dB
- − L_misc Miscellaneous hardware loss dB
P_rx = P_tx + G_tx + G_rx − L_path − L_cable − L_misc
- Available margin
- P_rx − S_rx
- Fade-margin check
- P_rx − S_rx ≥ M
Receiver scale
- S_rx
- Specified sensitivity for this receiver mode and performance criterion (dBm)
- M
- Required positive fade reserve (dB)
Subtract the losses
Subtract path, cable and miscellaneous losses. Compare the received power with the receiver’s sensitivity and the design target.
Power ledger
- P_tx Transmit power dBm
- + G_tx Transmit antenna gain dBi
- + G_rx Receive antenna gain dBi
- − L_path Path loss dB
- − L_cable Cable loss dB
- − L_misc Miscellaneous hardware loss dB
P_rx = P_tx + G_tx + G_rx − L_path − L_cable − L_misc
- Available margin
- P_rx − S_rx
- Fade-margin check
- P_rx − S_rx ≥ M
- Added path loss
- No added path loss
- Available margin with added loss
- 1 dB
- Receiver check
- Fade-margin criterion met
Receiver scale
- S_rx
- Specified sensitivity for this receiver mode and performance criterion (dBm)
- M
- Required positive fade reserve (dB)
In this example M is smaller than the 1 dB installation margin.
Place the installation reading
The installation reading has 1 dB of available margin. It meets the design target only when the required reserve is at most that margin.
Power ledger
- P_tx Transmit power dBm
- + G_tx Transmit antenna gain dBi
- + G_rx Receive antenna gain dBi
- − L_path Path loss dB
- − L_cable Cable loss dB
- − L_misc Miscellaneous hardware loss dB
P_rx = P_tx + G_tx + G_rx − L_path − L_cable − L_misc
- Available margin
- P_rx − S_rx
- Fade-margin check
- P_rx − S_rx ≥ M
- Added path loss
- ΔL = 1 dB − M
- Received power after added loss
- P_rx after loss = P_rx at installation − ΔL = S_rx + M
- Available margin with added loss
- 1 dB − ΔL = M
- Receiver check
- Fade-margin criterion met at equality
Receiver scale
- S_rx
- Specified sensitivity for this receiver mode and performance criterion (dBm)
- M
- Required positive fade reserve (dB)
In this example M is smaller than the 1 dB installation margin.
Reach the design target
The available margin equals the required reserve. The fade-margin criterion is met.
Power ledger
- P_tx Transmit power dBm
- + G_tx Transmit antenna gain dBi
- + G_rx Receive antenna gain dBi
- − L_path Path loss dB
- − L_cable Cable loss dB
- − L_misc Miscellaneous hardware loss dB
P_rx = P_tx + G_tx + G_rx − L_path − L_cable − L_misc
- Available margin
- P_rx − S_rx
- Fade-margin check
- P_rx − S_rx ≥ M
- Added path loss
- 1 dB − M < ΔL < 1 dB
- Available margin with added loss
- 1 dB − ΔL < M
- Receiver check
- Fade-margin criterion unmet. Received power remains above specified sensitivity.
Receiver scale
- S_rx
- Specified sensitivity for this receiver mode and performance criterion (dBm)
- M
- Required positive fade reserve (dB)
In this example M is smaller than the 1 dB installation margin.
Fall below the design target
Received power remains above specified sensitivity, while available margin is below the required reserve.
Power ledger
- P_tx Transmit power dBm
- + G_tx Transmit antenna gain dBi
- + G_rx Receive antenna gain dBi
- − L_path Path loss dB
- − L_cable Cable loss dB
- − L_misc Miscellaneous hardware loss dB
P_rx = P_tx + G_tx + G_rx − L_path − L_cable − L_misc
- Available margin
- P_rx − S_rx
- Fade-margin check
- P_rx − S_rx ≥ M
- Added path loss
- ΔL = 1 dB
- Available margin with added loss
- 1 dB − ΔL = 0 dB
- Receiver check
- At sensitivity. Fade-margin criterion unmet.
Receiver scale
- S_rx
- Specified sensitivity for this receiver mode and performance criterion (dBm)
- M
- Required positive fade reserve (dB)
In this example M is smaller than the 1 dB installation margin.
Reach specified sensitivity
When added loss equals the installation margin, received power is exactly at sensitivity.
Power ledger
- P_tx Transmit power dBm
- + G_tx Transmit antenna gain dBi
- + G_rx Receive antenna gain dBi
- − L_path Path loss dB
- − L_cable Cable loss dB
- − L_misc Miscellaneous hardware loss dB
P_rx = P_tx + G_tx + G_rx − L_path − L_cable − L_misc
- Available margin
- P_rx − S_rx
- Fade-margin check
- P_rx − S_rx ≥ M
- Added path loss
- ΔL > 1 dB
- Available margin with added loss
- 1 dB − ΔL < 0 dB
- Receiver check
- Below sensitivity. Fade-margin criterion unmet.
Recheck path loss when rain, vegetation or season changes. Check transmit power after a battery voltage drop and revisit gain or path loss if an antenna moves.
Receiver scale
- S_rx
- Specified sensitivity for this receiver mode and performance criterion (dBm)
- M
- Required positive fade reserve (dB)
In this example M is smaller than the 1 dB installation margin.
Fall below specified sensitivity
Further loss puts the signal below sensitivity. Recheck the budget when the site or equipment changes.
Technical boundaries. The worked reading starts 1 dB above specified sensitivity for the receiver mode and performance criterion shown. The required positive reserve is smaller than that starting margin. The replay varies only the added path loss after installation and calls for a fresh budget check if the site or equipment changes.