Lab 1: Read-Zone Setup
Lab 1: Read-Zone Setup
Lab 1: Read-Zone Setup
Start with a written read-zone plan before collecting data. The plan prevents the common mistake of moving the reader, tag set, and acceptance criteria during the same test.
Record these setup fields:
- Workflow name and location.
- Reader model or reader class, antenna count, antenna placement, reader settings, and firmware or configuration version.
- Tag type, mounting method, object material, tag orientation, and tag population.
- Intended zone boundary and exclusion zone boundary.
- Test scenarios: empty zone, expected tags present, nearby non-target tags, obstructed tags, moving tags, and removal or return events.
- Pass or fail criteria written as measurable evidence, not as optimism about expected range.
The first setup should be conservative. Lower power, reduce antenna spillover, and add shielding or physical separation before increasing coverage. A lab that reads everything everywhere is not controlled; it is only noisy.