Field Evidence for Redundant Coverage
Field Evidence for Redundant Coverage
Field Evidence for Redundant Coverage
Step-throughUse the reviewed schedule, weak-location field readings and gateway reachability to decide whether to narrow a redundant-area claim or seek repair evidence.
Claim under review · Redundant sensing across the monitored room under the reviewed schedule.
Schematic room · water treatment
Outline: monitored boundary. Squares: installed sensors. Blue antenna: gateway. Block: equipment.
Schematic room · water treatment
Outline: monitored boundary. Squares: installed sensors. Blue antenna: gateway. Block: equipment. Field check locations: C centre, E edge, K corner, Q beside equipment. Translucent dashed contours: planning footprints.
Planning footprints
Use them to choose probes across the monitored area.
Schematic room · water treatment
Outline: monitored boundary. Squares: installed sensors. Blue antenna: gateway. Block: equipment. Field check locations: C centre, E edge, K corner, Q beside equipment. Translucent dashed contours: planning footprints. Solid sensor outline: Awake. Dashed sensor outline: Sleeping.
Reviewed schedule
Awake footprints have stronger centre overlap than edge overlap in this planning view.
Schematic room · water treatment
Outline: monitored boundary. Squares: installed sensors. Blue antenna: gateway. Block: equipment. Field check locations: C centre, E edge, K corner, Q beside equipment. Solid sensor outline: Awake. Dashed sensor outline: Sleeping.
Field readings
Centre: Strong overlap. Edge and corner: Weaker evidence. Beside equipment: field check location, no result assigned.
Schematic room · water treatment
Outline: monitored boundary. Squares: installed sensors. Blue antenna: gateway. Block: equipment. Field check locations: C centre, E edge, K corner, Q beside equipment. Solid sensor outline: Awake. Dashed sensor outline: Sleeping. Dashed route: schematic reporting path only.
Field readings
Centre: Strong overlap. Edge and corner: Weaker evidence. Beside equipment: field check location, no result assigned.
Verify gateway reachability · Pending
Schematic reporting path · gateway reachability unspecified by the worked example.
Schematic room · water treatment
Outline: monitored boundary. Squares: installed sensors. Blue antenna: gateway. Block: equipment. Field check locations: C centre, E edge, K corner, Q beside equipment. Solid sensor outline: Awake. Dashed sensor outline: Sleeping. Dashed route: schematic reporting path only.
Field readings
Centre: Strong overlap. Edge and corner: Weaker evidence. Beside equipment: field check location, no result assigned.
Verify gateway reachability · Pending
Schematic reporting path · gateway reachability unspecified by the worked example.
Broad approval · On hold
Narrow to validated zones · unavailable here. Each proposed zone needs independent awake sensing throughout and verified gateway reachability.
If no zone qualifies, request repair evidence
New weak-location readings · updated active-set and independence checks · gateway connectivity pass · record of the closed gap.
Schematic room · water treatment
Outline: monitored boundary. Squares: installed sensors. Blue antenna: gateway. Block: equipment. Field check locations: C centre, E edge, K corner, Q beside equipment. A Solid sensor outline: Awake. Dashed sensor outline: Sleeping. Dashed route: schematic reporting path only.
Field readings
Centre: Strong overlap. Edge and corner: Weaker evidence. Beside equipment: field check location, no result assigned.
Verify gateway reachability · Pending
Schematic reporting path · gateway reachability unspecified by the worked example.
Broad approval · On hold
Narrow to validated zones · unavailable here. Each proposed zone needs independent awake sensing throughout and verified gateway reachability.
If no zone qualifies, request repair evidence
New weak-location readings · updated active-set and independence checks · gateway connectivity pass · record of the closed gap.
Retest triggers · matching plan and legend badges
S · sensor movement A · schedule change L · equipment layout change F · failed reading G · gateway relocation
The claim asks for backup sensing across the monitored room during normal operation.
Technical boundaries. The room drawing is schematic, and its dashed footprints guide where to take field readings. The example leaves the probe beside the equipment without a reading result. The dashed reporting routes show where to check and gateway reachability remains unverified.