Trace an Outage in the Building Pilot
Trace an Outage in the Building Pilot
Trace the healthy baseline
Fault isolationTrace a sensor report through the gateway and its backhaul, the link to the wider network. The candidate has a separate local lighting path.
Before cutting the backhaul, predict where the next report will stop.
MonitoringBranch of a candidate star or star-of-stars
Future lightingProposed separate local segment · Assumption to verify
Pilot evidence card
Before each run, name the required functions and the conditions agreed with the site. Start each run from the healthy baseline and isolate the named fault.
| Record the observation | Backhaul only | Gateway only |
|---|
Flag the design for review if a required function fails under its agreed condition.
Technical boundaries. Each fault is isolated from a healthy baseline. The future lighting path remains a proposal whose power, command delivery and manual override need testing on site. Buffered delivery after restoration is a check for sites with buffering configured.